|
The project comprises the construction of a 2-level Gas Insulated Switchgear building, complete with basement, control, relay and auxiliary buildings. The structures all feature precast and insitu concrete, metal sheet walls and roofs.
The scope of works also includes an Air Insulated Switchgear yard and 2km of underground concrete cable troughs.
|